Case Study

Eastcheap Office

37-39 East Cheap

A Central London Office Refurbishment.

PROJECT WORK

Levels 01 – 05. Corporate office + new ground floor reception to service office, ground and lower ground levels plus a new lift to serve the offices.

LOCATION

CENTRAL LONDON

PROJECT VALUE

 £500K

£500K

PROJECT VALUE

24 Weeks

PROJECT DURATION

Project Details

The works consists of the following:

  • LV distribution throughout the building.
  • Containment throughout the building for LV sub-mains, LV final circuits, IT cabling, security cabling, BMS cabling, fire detection and voice evacuation cabling and controls, including trunking, conduits, high-level tray and trunking.
  • Cat 6, structured cabling throughout the building.
  • Small power installation including underfloor trunking, and floor boxes.
  • Electrical connections to mechanical plant.
  • General/emergency and feature lighting
  • Design and installation of new fire alarm system, detection, and interfaces with other systems.
  • Access control.
  • Intercom.
  • Earthing system.
  • Fire stopping